CASE STUDY / ELECTRICAL CONTRACTING / 2025

Park Ave Electrical

A licensed five-borough electrical contractor with no website, no copy, and no digital presence of any kind. One month later: six pages, organised around the four different states of mind a New Yorker is in when they go looking for an electrician.

Client
Park Ave Electrical
Sector
Electrical contracting — residential, co-op, commercial
Territory
Manhattan · Brooklyn · Queens · The Bronx · Staten Island
Year
2025
Engagement
Four weeks, kickoff to launch
Scope
Content strategy · Copywriting · Brand voice · UI · UX · Front-end build
Stack
React · Tailwind CSS · six routes
01 / THE PROBLEM

Park Ave Electrical had no website. Not a dated one, not a page builder someone's nephew put together — none.

They are licensed Master Electricians working across all five boroughs, specialising in the work most contractors decline: knob-and-tube remediation in landmarked brownstones, DOB permit filing, panel replacements in buildings where the service closet is behind plaster and the freight elevator books out three weeks ahead. The expertise was real. It was reachable only by a phone number passed between building managers.

Electrical work is bought in one of two states: planned, or panicked. Planned buyers compare. Panicked buyers take the first credible option they find. Both start in the same place, and Park Ave Electrical wasn't in it.

The brief was everything: what the company says, how it says it, and where it lives.

02 / THE APPROACH
02.01

Organise by the customer's state of mind, not the trade's taxonomy

Most electrical contractor sites list services the way an electrician writes an invoice: rewiring, panel upgrades, installations, repairs. Accurate, and useless to somebody who doesn't yet know which of those words describes their problem.

We kept those four headings — they're what people scan for, and abandoning them would have cost more than it gained. Underneath each one, we organised by the situation that brought the visitor there. Four sections, four different logics:

SectionOrganised byReads as
RenovationsThe roomKitchen · Bathroom · Historic home · Whole-home · Basement
InstallationsThe thing you want200-amp panel · EV charger · Generator · Recessed lighting · Dedicated circuits
Safety & ComplianceThe obligation you're facingDOB/ECB violations · Local Law 157 · Grounding · GFCI/AFCI · Egress lighting
TroubleshootingThe symptomFlickering lights · Dead outlets · Tripping breakers · Burning smell at the panel · Post-flood

Someone remodelling a kitchen and someone smelling burning plastic are not the same visitor and shouldn't be handed the same list. The renovation buyer is thinking about a room. The emergency caller is thinking about a smell. Each section meets its reader in the vocabulary that reader already has.

02.02

Specificity as the credential

Plaster-and-lath. Knob-and-tube. Co-op board approval. DOB permit filing, EA/PA plus PW2. Con Edison coordination. Landmarks Preservation standards. Local Law 157. Fuse-to-breaker conversion. IC-rated fixtures for low plaster ceilings. Brownstone crawlspaces.

Every one of these is a term a national franchise site cannot use convincingly, because using it correctly requires having done the work. A homeowner in a pre-war walk-up doesn't need to be told the company is trustworthy. They need to see that it knows what's behind their walls.

We wrote the entire site to that standard, and set it as a rule in the voice guide: prefer "knob-and-tube in brownstones" over "we do rewiring." No superlatives, no best-in-class, no stock reassurance. The proof is in whether the copy could have been written about any other city.

02.03

Build for the emergency, not the browse

The hardest visitor to design for is holding a phone in a dark hallway with a tripped panel. They are not reading. They are looking for a number.

So: click-to-call in the header on every page, the phone number repeated at the close of every section, and a build tuned so nothing moves under their thumb while they're trying to tap it. Cumulative Layout Shift came in at 0.001 and Total Blocking Time at zero — which in practice means the tap target is where it looked like it was, and the page responds the instant it's touched.

That's the least glamorous decision on this project and probably the one that matters most.

03 / EVIDENCE
Performance
86
Accessibility
88
Best Practices
96
SEO
91
First Contentful Paint
1.4s
Largest Contentful Paint
1.7s
Total Blocking Time
0ms
Cumulative Layout Shift
0.001

Google Lighthouse 13.3.0 · emulated desktop · 31 July 2026

Total Blocking Time of zero and Cumulative Layout Shift of 0.001 are the two numbers worth pausing on. Together they mean the page never shifts under a thumb and never stalls on a tap — which is the whole design brief for an emergency caller, expressed as a measurement.

04 / ARTIFACTS
Park Ave Electrical homepage, desktop view, showing the gold-on-photography hero and service navigation.
Park Ave Electrical — homepage, desktop.
LIMITATIONS